Back
Uncategorized

Find The Relationships in The Owner / Architect Agreement

Use AIA Document B101 – 2007 Agreement Between Owner and Architect to illustrate some of the

various relationships within an Owner / Architect agreement.

The Assignment makes evident several relationships within the contract

:

For each of five selected topic areas, extract from the entire body of the contract the subset of provisions from different contract sections that contain or in some way refer to the topic. all i need 5 to 6 provisions for each of the five  selected topic areas.

understanding Contracts”.)

B. Assignment Specifics:

For each of the topic areas below, read through the entire contract and cite (in list form) as many

paragraphs as possible that contain the topic &/or related concept. area concept.

Note: Many paragraphs will be cited twice or more under different topics; this is an

important concept.

Citations should be formatted to list the paragraph number first, followed by a 1-8+/- word “name”

or “descriptor phrase” of your choice for the paragraph, (don’t copy the entire text of the paragraph).

1) Estimate of the Cost of the Work

Related concepts: “(Owner’s) budget for the Cost of theWork”

Professional Practice

LTU / CoAD / ARC 5913

Assignment #1

Relationships in the Owner / ArchitectAgreement

Page 2 of 4

9/26/2016 6:16

2) Schedule

Related concepts: “Perform its services”; “anticipated dates”; “time limits”’ “reasonable

promptness”; “in a timely manner”

3) The Architect’s Services

Related concepts: “Basic Services”; “professionalservices”; “services provided by the Architect”

4) Additional Services

Related concepts: (Always called Additional Services)

5) Owner’s Consultants; The Contractor (two concepts for this

item) Related concepts: For Contractors: “Bidder(s

You will find the assignment sheet attached with AIA Document B101 – 2007 and use the word document attached for the answer.