INDIVIDUAL DESIGN & MANAGEMENT TASKS Brief No. 5: Civil Engineering Management Tasks.
Project leader: TC A.) SUMMARY Technical, Management and related tasks
1. Identify the options available under the NEC3 suite of contracts for procurement for the Copperfields site
2. Produce a structured programme of works in accordance with the procurement strategy and demonstrate tracking for one payment cycle. B.) DETAILS OF REQUIREMENTS You should produce a Report to the Client on the procurement of the intended Works. You are required to review the procurement options under NEC3 and the Client’s needs and to then recommend, with justification, a procurement plan for the full cycle of the project, not just the construction phase. The Report must also indicate, again with justification, the intended NEC documents to be used and the liaison and supervision arrangements which will need to be in place for each phase of the life cycle. You should develop a detailed, resourced, resource-managed and costed programme for the project using MS Project which is saved as MS Project 2010. This can cover the whole life cycle. The programme must match the intended procurement route. A Work Breakdown Structure (WBS) is to be prepared and the planning must be structured within this WBS. As a minimum, baseline time and cost information is to be prepared for the various stakeholders and the submission should also demonstrate tracking of the project for the first payment cycle. Throughout the development of this work, it is essential that there is consistency and linkage between all of the components
INDIVIDUAL DESIGN & MANAGEMENT TASKS Brief No. 5: Civil Engineering Management Tasks