Earthwork Quantity Takeoff Report.
Earthwork Quantity Takeoff Report
Please reference the attached set of plans for the below three questions which you will need to answer(included also on drawing C-103). Use your knowledge of the Bluebeam Revu quantity takeoff features, to answer the questions. – How much, and what type, of subbase material is under this slab? – How much backfill material is needed behind this length of wall. Note the grade changes from north to south. Assume open cut excavation and very dry clay as the existing soil type. – How much cut or fill in this area – use the Cross Section Area method ****Show all your work. No points will be given for the answers only. Show sketches, provide a narrative, use a Microsoft Excel spreadsheet, or whatever you think you will need to show me you understand how to answer the question. I will grade based on the following criteria: Presentation/Professionalism (25%) Comprehension (50%) Accuracy (25%)