Back
Uncategorized

ARE459-Contracts and Specifications

In this assignment there are 3 questions, each question need to describe 5 points, each one of these points need to be described in around 35 words.

Consult with a local construction company to answer the following questions:

1. Describe 5 factors, based on which contractors would specify their fees in construction projects.
2. Describe 5 cost control techniques used by contractors in construction projects.
3. Describe 5 components of project overhead cost in construction projects.